Skip to content
Synthoriq

SERVICE · CLOUD

Cloud & Modernization

Cloud migration goes wrong in two directions: lifting a system unchanged and paying more for the privilege, or rearchitecting everything at once and discovering the schedule was fiction. We work between those, moving components in an order determined by cost and risk, and changing only what the move actually requires.

THE PROBLEM

The cloud bill went up and nobody can say which service caused it.

The common outcome of a hurried migration is a system that runs in a data centre somebody else owns, at a higher monthly cost, with the same operational problems and a new set of ones nobody has experience with. Instances sized for a peak that happens twice a year run continuously. Storage tiers were never revisited. Data transfer between zones appears on the bill without appearing in any diagram. Meanwhile the deployment process did not improve, because the deployment process was never part of the migration. The cost is real but the cause is diffuse, which is why it rarely gets addressed until someone is asked to explain it.

Signals you might recognize

  • The cloud bill is growing faster than usage, and the attribution is unclear.

  • Infrastructure is configured through a console, so nobody can reproduce an environment.

  • Scaling means asking somebody to resize an instance.

  • A migration was started, partly completed, and quietly stopped.

WHAT WE DELIVER

What this actually includes.

Concrete engineering capabilities deployed as part of this service practice.

  • 01 / 06

    Migration assessment

    Component-by-component analysis of what to move, what to re-platform, what to rewrite, and what to retire, with the cost and risk of each stated rather than assumed.

  • 02 / 06

    Re-platforming

    Moving to managed databases, queues, object storage, and identity where the managed version is genuinely cheaper to operate, and keeping what you run yourself where it is not.

  • 03 / 06

    Containerization

    One definition of the runtime so local, staging, and production stop disagreeing. Kubernetes only where the workload justifies operating it — it is a cost, and we say so before adding it.

  • 04 / 06

    Infrastructure as code

    Environments defined in version control and applied through a pipeline, so a change is reviewable and an environment is reproducible rather than remembered.

  • 05 / 06

    Delivery pipelines

    Automated build, test, and deployment with environment promotion and a rollback that has been used rather than documented. This is usually where the operational saving actually comes from.

  • 06 / 06

    Cost and observability work

    Tagging and attribution so spend maps to services and teams, right-sizing against measured usage, and monitoring that reports on the symptoms users notice.

HOW WE WORK

How we approach Cloud & Modernization.

Milestone-driven delivery, so integration problems surface in week two rather than in week ten.

01

Inventory and attribute

What runs, what it costs, what depends on it, and what its actual utilisation looks like. Migration decisions made without utilisation data reproduce the current sizing in a more expensive place.

Stage 01 activities
  • Component inventory with dependency mapping
  • Current cost attribution, including the parts nobody has looked at
  • Utilisation measurement over a representative period
  • Data gravity and residency constraints identified early

02

Decide per component

Retire, retain, re-host, re-platform, or rebuild — chosen per component against cost, risk, and how often it changes. Applying one strategy to a whole estate is what produces both of the classic failures.

Stage 02 activities
  • A disposition decision per component with stated reasoning
  • Sequencing by risk and value, cheapest wins first
  • Target cost model built before commitment
  • The list of what will deliberately not move

03

Build the target ground floor

Networking, identity, secrets, logging, and the deployment pipeline exist and are tested before the first workload arrives. Migrating into an environment that is still being invented is how a schedule becomes fiction.

Stage 03 activities
  • Network, identity, and secret management defined in code
  • Centralised logging and metrics before the first workload
  • Deployment pipeline with environment promotion
  • A non-production environment that genuinely matches production

04

Move in slices, with a way back

One component at a time, running in parallel where possible, with traffic moved gradually and a rollback that is a routing change. The system stays live throughout; there is no weekend where it is neither here nor there.

Stage 04 activities
  • Parallel running with traffic shifted incrementally
  • Data synchronisation and cutover rehearsed before the real one
  • Per-slice monitoring and an agreed rollback trigger
  • Decommissioning only after a defined quiet period

05

Right-size against reality

After a few weeks of real load, resize against measured usage rather than the pre-migration guess, review storage tiers, and set attribution so the next cost question has an answer.

Stage 05 activities
  • Right-sizing against measured rather than estimated load
  • Storage tiering and retention policy review
  • Tagging so spend attributes to services and teams
  • Budget alerts on the components that can grow unnoticed

TECHNOLOGY DEPTH

Technologies behind Cloud & Modernization.

The libraries, runtimes, and services we standardise on for this work, and keep patched.

Backend

  • .NET
  • Node.js
  • Python

Data

  • PostgreSQL
  • Redis

Cloud

  • Azure
  • AWS
  • Docker
  • Kubernetes
  • Vercel

DELIVERABLES & OUTCOMES

What you receive, and what actually changes.

We measure success by durable working software in your possession, not presentation slides.

What you get

  • An assessment with a disposition decision and cost estimate per component

  • Infrastructure defined in version control and applied through a pipeline

  • Container images and a runtime definition shared across environments

  • Automated deployment with environment promotion and a tested rollback

  • Centralised logging, metrics, and alerting across the estate

  • Cost attribution by service and team, with budget alerts

What changes

  • A migration that runs during business hours, one component at a time

  • A cloud bill that attributes to services, so a cost question has an answer

  • Environments reproducible from version control rather than from memory

  • Deployment and rollback as routine operations instead of scheduled events

QUESTIONS & ANSWERS

Questions about Cloud & Modernization.

Direct answers to common technical and engagement questions.


Have something ambitious to build?

Tell us what you're working on. We'll tell you honestly whether we're the right team for it.